Selected work

Dirt at a scale that only works if you own the trucks

Some of these jobs we supplied. Some we dug. On one of them we were the prime contractor. What they have in common is volume that only moves on schedule if the pits and the iron are yours.

Here’s a look at the work.

Municipal

Spellman Detention Basin

In 2025 we completed excavation of the Spellman Detention Basin for the City of Houston, at West Belfort and Willow Waterhole Bayou.

We removed approximately 300,000 cubic yards of material, installed a clay liner, poured a concrete overflow weir, installed pilot channels, and installed an outfall structure fitted with a flap gate.

  • Approximately 300,000 cubic yards removed
  • Clay liner installed
  • Concrete overflow weir poured
  • Pilot channels installed
  • Outfall structure with flap gate

Get a quote

Aerial view of the completed Spellman Detention Basin, with concrete pilot channels running the length of the excavated basin between a residential street and Willow Waterhole Bayou.

Aerial view of the completed Wortham Stormwater Detention Basin, with concrete pilot channels fanning across the excavated floor toward a concrete apron and an access road around the rim.

Municipal

Wortham Stormwater Detention Basin

In 2026 we completed the Wortham Detention Pond, at Huffmeister and Fallbrook Drive.

We excavated approximately 175,000 cubic yards of material, installed pilot channels, an overflow weir and an outfall structure, and constructed a perimeter limestone access road.

  • Approximately 175,000 cubic yards excavated
  • Pilot channels installed
  • Overflow weir installed
  • Outfall structure installed
  • Perimeter limestone access road

Get a quote

Municipal

Bretshire Stormwater Detention Basin

The City of Houston hired us as prime contractor — not as a supplier to somebody else’s prime. We removed and legally disposed of 825,210 cubic yards of dirt in 400 calendar days, on a contract worth $4,715,038.

That first number is the one worth sitting with. 825,210 cubic yards only moves on schedule if you own the iron that moves it.

The basin it left behind is projected to improve drainage for 90,000 homes in a part of Houston where flooding has been a constant problem.

Sprint Sand & Clay is an approved contractor with the City of Houston, Harris County and many other municipalities across Greater Houston.

  • 825,210 cubic yards removed and disposed
  • 400 calendar days
  • $4,715,038 contract
  • Drainage for a projected 90,000 homes

Get a quote

Placeholder illustration for the Bretshire Stormwater Detention Basin project

Placeholder illustration for the Magellan Midstream tank storage facility project

Industrial

Magellan Midstream Tank Storage Facility

Industrial work is the most regulated dirt there is. Stringent specifications, strict qualifications on who is even allowed to deliver, and no tolerance for material that doesn’t test out.

This midstream tank storage facility off Wallisville Road took 21,000 cubic yards of imported material — every yard of it to spec.

If your project has a qualification process, we have been through it.

  • 21,000 cubic yards imported
  • Material supplied to specification

Get a quote

Commercial

Katy ISD Elementary School #37

We supply Independent School District projects across Greater Houston year after year. Schools run on a calendar that does not move — the doors open in August whether the pad is ready or not.

This elementary school off FM 1463 took 15,000 cubic yards of imported material.

Having pits all around the Houston area means a shorter haul to your site. On a school schedule, that is the difference between comfortable and frantic.

  • 15,000 cubic yards imported
  • Delivered to a fixed school calendar

Get a quote

Placeholder illustration for the Katy ISD Elementary School #37 project

Placeholder illustration for the Watermark at Sienna Plantation project

Residential

Watermark at Sienna Plantation

A three-story multifamily complex at Highway 6 and Sienna Ranch in Missouri City, and a good example of the middle ground we work in constantly — subdivision volumes held to a commercial spec.

Whatever the application, the material meets the spec sheet it was ordered against.

Get a quote

Also on the board

More recent work

A few others from the last several years, listed by name while we pull together the detail and the photographs.

  • Remington Ranch — detention pond
  • Amenity Lake, Boudreaux Road — detention pond
  • Hidden Arbor — detention pond
  • Clean Harbor — industrial plant
  • Cypress Creek Lakes
  • Harpers Preserve
  • Super Block — parking garage

See something like your job?

Call Central Dispatch. Tell us what you’re building — or what you need gone — and we’ll tell you what it takes.

Call 281-277-5404 Send us the details