Ordering material is mostly geometry, and geometry is easier with a calculator. Tell us how big the area is and how deep you want to go, and these will handle the rest.

One honest warning up front: these give you an estimate. Real dirt settles and compacts and never quite matches the math. Order about 10% more than the number you get and you'll thank yourself later — running short halfway through is a much worse problem than having a little left over.

Material calculator

For pads, driveways, backfill, garden beds — anything where you know the footprint and how deep you're going.

How much material do you need?

Shape of the area

Enter your measurements and the numbers will appear here.

Coverage calculator

Already have a number in mind? This one works both directions — how deep a load will spread, or how much you need to hit a certain depth. Handy for topsoil.

How far will it spread?

What are you working out?

Not sure? Length times width, in feet.

cubic yards

Enter your numbers and the answer will appear here.

How this works

No mystery to it. Everything above comes from two lines of arithmetic:

Cubic yards = length × width × depth, in feet, divided by 27.
There are 27 cubic feet in a cubic yard. That's the whole trick.

Round areas: 3.14 × radius × radius × depth, divided by 27.
Radius is half the diameter. Same idea, rounder.

Watch your units. Depth is the one that catches people — four inches is a third of a foot, not four feet, and that mistake orders you twelve times too much material.

Why we tell you to order extra

Material shows up loose and ends up compacted. Between the truck and the finished grade you lose volume to settling, to spreading unevenly, and to the low spots you didn't know were there.

Ten percent covers most jobs. If the site is rough, or you're filling something that's been sitting a while, go higher.

The other reason: a second delivery costs more than a slightly bigger first one, and it costs you a day. Ordering short is the expensive mistake.

Not sure? That's what Central Dispatch is for. We've been sizing these orders since 1982 and we like the easy questions.

Questions people ask

It depends on the truck and the material, and we'd rather give you the real number for your job than a rough one here. Call Central Dispatch with your cubic yards and we'll tell you exactly how it ships.

For a new lawn, four to six inches gives roots somewhere to live. Topdressing an existing lawn, two to three inches is plenty. Garden beds usually want more — six to twelve, depending on what's going in.

About one cubic yard per 324 square feet. So a 4,000 square foot yard takes roughly 12 cubic yards to come up an inch. Use the coverage calculator above and it'll do the arithmetic for your exact footprint.

Yes, and a lot of jobs are quoted that way. Tonnage depends on the material and how wet it is, so give us a call with your cubic yards and we'll convert it for you.

Not at all. One truckload for the backyard is the same phone number the big builders call.

Got a number? Let's get it on a truck.

Tell us the material, the quantity and where it's going. A real person picks up.

Call 281-277-5404 Send us the details